Defence Projects
Lavarack Barrack
50 Metre Pool
Townsville, Queensland
Completed
The Lavarack Barrack 50 metre pool reconstruction involved a comprehensive overhaul of the pool, including the installation of a new membrane, tiling, epoxy painting, wet deck grates, joint seals, depth markers, main valve, inlet fixings, signage, pool surrounds, and lane ropes.
Additionally, a Sika Combiflex Joint System was implemented to ensure the structural integrity of the pool.
In addition to the pool itself, the project also included the supply and installation of a new backwash tank, as well as new kerbing and concrete surrounds for the main pool. These improvements were made to enhance the safety, functionality, and aesthetic appeal of the pool, providing a modern and inviting space for training.
Project Highlights
Contract Price:
Completion Date:
$3.5 Million
December 2023